DEPARTMENT FOR SALE AT GEÇİT ÜMRANİYE SITE FROM DİALOG PROAS

Geçit
Apartment • 4 room(s) • 2 bath. • 120 m² • 1st floor • ref: 302245
$71,183

SITE

2 Block Ümraniye site was completed in 2011 with BAKYAPI quality and assurance.

Built on a land of 2776 m2,

There are a total of 40 apartments and 2 shops, 4 of which are 4 on each floor of 2 blocks.

Uniform apartments are built and the gross apartments are 150 m2 and 3 + 1.

The complex is located opposite the Martur Factory in the Passage.

The property is 400 metres from Mudanya road, 375 metres from Özhan Market and 530 metres from Özdilek.

Migros Jet is located at the back of the site.

The control is used at the vehicle entrance to the site garden and the blocks can be entered with a password.

Cameras in the garden record the inside of the site.

The apartments are heated by natural gas combi boiler.

Wet volumes on the floors of the apartments, laminate flooring in all other areas, pvc joinery in the windows are used.

The apartment for sale is located on the 1st floor of the 5-storey block and the front balcony of the apartment overlooks Martur.

Theapartment with a façade has a façade in the northwest and southwest directions.  

The kitchen includes a stove, oven and hood, and the master bedroom has a bathroom.

PLEASE CONTACT US FOR MORE INFORMATION.

Bayram OZGUR

0531 950 06 34

IMMOVABLE TRADE AUTHORIZATION CERTIFICATE NUMBER : 1601067

''PLEASE DO NOT WORK WITH ILLEGAL AND UNAUTHORIZED PERSONS, DO NOT BE A VICTIM. !!! ''



This announcement is automatically integrated by the RE-OS Real Estate MLS Program .

Spaces

Rooms4
Floors5
Bathrooms2
Toilet rooms3
Balconies2

Surfaces

Living120 m²
Total150 m²
Balcony
Garden
Intercom
Internet
Lift
Parking
Sauna

Geçit

The agent has not provided the exact address for this property. You can request it here.
Day care
Highway
Hospital clinic
Movies
Park
Primary school
Public transport
Shops
Sport center
Town centre
University
Clear view on city
South orientation
Southwest orientation
West orientation
TypeApartment
Construction year2012
HeatingGas